Curious about a sample of what we can do? Here you'll find some impressive projects that the teams at the Verhelst Group have enthusiastically worked on over the past months. From demolition and earthworks to infrastructure works, and from sand extraction to asphalt production. The result is always worth it! And this is just a selection of our many projects, not nearly everything!
N33 Oostendestraat Torhout
The passage to Torhout was completely reconstructed over a 3.2 km route in 5 phases by Verhelst Aannemingen, part of the Verhelst Group: from separate sewer systems (disconnection of rainwater) to road infrastructure, dedicated bike paths, and green spaces.
New South - Antwerp
Total project. Verhelst Aannemingen, part of Verhelst Group, is responsible for the earthworks, sewerage, roadworks, and landscaping for the construction of the entirely new district 'Nieuw Zuid' in Antwerp, commissioned by Attis/Triple Living. The works will proceed in different phases until 2028. Nieuw Zuid covers an area of 18 ha and will comprise 2000 residential units, along with schools, daycares, a sports hall, a student complex, and 10 residential towers of 24 floors (80m high). In total, 10km of sewerage will be laid and there is earthmoving including building pits of 1,000,000m³.
Junction Melle/Ghent/Merelbeke
Sewer and infrastructure works on Mellestraat (Melle), Merelbekestationsplein and Bloemstraat (Ghent) and Theaterstraat (Merelbeke), carried out by Verhelst Aannemingen, part of Verhelst Group, according to schedule in 10 months' time. Due to the high chance of bombs from WWII, work was done under the supervision of bomb experts. During the works, a WWII bunker was uncovered.
Demolition of KV Oostende Stadium
In preparation for the construction of the current modern stadium of KV Oostende, Verhelst Aannemingen, part of Verhelst Group, carried out the demolition work on the main stand of the then Albertparkstadion.
Demolition of buildings Kouter - Ghent
Meticulous partial demolition of buildings while preserving the façade in an urban environment by Verhelst Aannemingen, part of the Verhelst Group.
Reconstruction of Road Section E17 Kruishoutem - Deinze
In 7 days, 7 km of highway was dismantled by Verhelst Aannemingen, part of the Verhelst Group. No fewer than 14 machines were deployed 24/7 with maintenance technicians on site at the construction site. Afterward, we applied lean concrete with millimeter precision using GPS-controlled machines.